Process & contractsSeptember 30, 20264 min read

How to write a development specification

In short

A working specification answers seven questions: why the product exists (the business goal), who uses it, which scenarios it covers, what roles and permissions it has, which systems it exchanges data with, what goes into the first phase — and, as a separate list, what does NOT. You can write it in plain words: the client's job is to describe the business, not the architecture. The contractor builds the technical side on top of that, and that's exactly what they're accountable for.

Contents
  1. 01Why a spec, if you can "just explain it"
  2. 02The seven blocks of a working spec
  3. 03Write in business terms, not technology
  4. 04Common mistakes
  5. 05If there's no one to write the spec

Why a spec, if you can "just explain it"

The temptation to skip this stage is understandable: it all seems clear, and writing takes time. But practice is simple: until a task is written down, the client and the contractor each hold a different version of it — and the difference surfaces at acceptance, when rework costs the most.

Until a task is written down, the client and the contractor each hold a different version of it — and the difference surfaces at acceptance, when rework costs the most.

The document's second purpose is comparing proposals. Without a spec, three contractors will price three different products, and choosing on price becomes impossible: the cheapest will be whoever understood the least.

The seven blocks of a working spec

A structure that's enough for most projects:

Business goal

What to write
What problem the product solves and how you'll know it works (leads, hours saved, fewer errors)

Users

What to write
Who exactly uses it and in what context — a customer on a phone on the go and an accountant at a desk need different things

Scenarios

What to write
Step by step, what a person does from entry to result. The most valuable part of the document

Roles and permissions

What to write
Who sees and changes what — a typical source of hidden complexity

Integrations and data

What to write
Which systems it exchanges data with (1C, CRM, payments, Kaspi), where data comes from, where the source of truth lives

First phase

What to write
What must be in the first release

What's NOT included

What to write
An explicit list of what's postponed — the budget's and timeline's chief protector

Write in business terms, not technology

A common mistake is trying to phrase the spec in development language: "we need a microservice architecture on Kubernetes". The moment the client takes on choosing technical solutions, they take on responsibility for the consequences — and usually have no way to verify those choices.

Compare two phrasings:

An instruction in technology terms

  • "Build a REST API for synchronization"
  • The contractor will carry it out literally

A requirement in business terms

  • "Warehouse stock must match on the website and in 1C within 15 minutes"
  • An engineer derives the solution from it — and stays accountable for the result

Common mistakes

What most often breaks even a carefully written spec:

  • Everything at once: a hundred features with no priorities. The estimate becomes unaffordable and the project endless.
  • Vague wording: "convenient", "modern", "fast" can't be checked at acceptance. Replace with measurable: "the page loads in under two seconds".
  • No "not included" list — the project's boundaries will get drawn during a dispute.
  • A copied spec from someone else: it describes another business, and you'll be the one paying for it.
  • No decision owner: if a department of five approves the spec with no one responsible, every iteration doubles.
  • Forgotten non-functional requirements: load, availability, data-storage rules — they surface at the end, and expensively.

If there's no one to write the spec

That's normal, especially for a first product. There are three paths:

A brief with what you have

What to do
Bring the idea, examples of other products, a description of the process in your own words to the brief
What you get
A capable contractor will draw out the rest with questions

Design

What to do
Order design as a separate stage
What you get
A document, a prototype and an estimate you can take to any builder

MVP

What to do
Start with an MVP: narrow the task down to the core scenario, where there's little to describe
What you get
The details emerge from real users

At InterLAB, unpacking the task is part of the brief: come with an idea, leave with a "first phase / second phase" map and an estimate after reviewing the task. Even if you build elsewhere, the document stays with you.

Tell us about your task — we'll review your request and get back to you

Got a project?
We'll scope and estimate it — for free.

Tell us about the product or the problem. After reviewing the task we'll come back with an architecture, a timeline and a price for the first version.

  • Scope and risks estimated before we start
  • NDA — yours or ours
  • Work starts within a week

Please do not send passwords, access keys or source code through this form — we will agree a safe way to share access separately.

By clicking the button you agree to the processing of your personal data.