The cost of a custom ERP depends on the number of modules, user roles, integrations (1C, Kaspi) and the volume of data to migrate, so it is estimated in phases. InterLAB's reference points: a first ERP phase from 5 million ₸ in 2–4 months, a turnkey ERP from 10 million ₸ in 4–8 months. These are lower bounds, not a price list: an exact estimate by module is free after a brief. Support is priced individually.
Discuss your project?
A timeline and cost estimate broken down by stage — after the brief.
Contents
What counts as ERP, and when CRM is enough
ERP is a single system for a company's resources: orders, stock, purchasing, production, finance, staff. A CRM tracks customers and sales; an ERP covers everything that happens to an order after the sale. If the price worries you, first check whether you actually need an ERP.
CRM is enough
- The main pain is lost leads and chaos in sales
- Stock and accounting already run in 1C and work for you
- You need to see the pipeline and what managers do
- Orders do not pass through several departments
You need an ERP
- An order passes through stock, purchasing, production or delivery
- Stock and money data sit in different spreadsheets and disagree
- The head of the business cannot quickly see the margin per order
- Several divisions, roles and locations, with access rights to separate
The difference is covered in detail in the article «CRM or ERP: what a business should choose», and the terms (MRP, WMS and others) in the «Dictionary of systems». The cost of a custom CRM has its own article, «How much a custom CRM costs».
What makes up the cost of an ERP
The price of an ERP is set not by the size of the program but by the set of decisions to build and test. These are the lines a quote is made of.
Modules
- What it depends on
- Orders, stock, purchasing, production, finance, HR
- How not to overpay
- Start with the modules where money is lost today
Roles and permissions
- What it depends on
- Number of divisions, access levels, approvals
- How not to overpay
- Describe roles up front: changing permissions later costs more
1C integration
- What it depends on
- One-way export or two-way exchange, size of the reference data
- How not to overpay
- Decide which system is the master for each kind of data
Kaspi and marketplace integration
- What it depends on
- Orders, stock, prices, statuses
- How not to overpay
- Connect the channel that brings most of your orders
Data migration
- What it depends on
- Volume and cleanliness of data in spreadsheets and old systems
- How not to overpay
- Remove duplicates and stale records before the move
Reporting
- What it depends on
- Number of reports, level of detail, split by branch
- How not to overpay
- Pick the 5–7 reports that decisions are actually based on
Load and reliability
- What it depends on
- Number of users, volume of operations, availability needs
- How not to overpay
- Plan for growth over 2–3 years, not for launch week
A phased approach: first phase, then modules
An ERP should not be built in one go: requirements become clearer as work proceeds, and staff get used to the system gradually. A workable scheme is a first phase with the core, then modules by priority.
Process description and design
- What is inside
- Process map, roles, list of modules, order of phases
- Reference point and timing
- Estimate free after a brief
First phase
- What is inside
- The core: orders and stock, roles, basic reports, transfer of key data
- Reference point and timing
- From 5 million ₸, 2–4 months
Further modules
- What is inside
- Purchasing, production, finance, extended reports, integrations
- Reference point and timing
- Turnkey ERP from 10 million ₸, 4–8 months
A hypothetical budget by stage
A hypothetical example: a wholesale company with one warehouse wants to combine orders, stock and purchasing, exchange data with 1C and receive orders from Kaspi. The figures below are hypothetical and only show how a budget is distributed; they are not an offer or a fixed price.
First phase
- What is inside
- Design, orders, stock, roles, basic reports
- Hypothetical amount
- 5.0
Data migration
- What is inside
- Item catalogue, counterparties, stock from spreadsheets and 1C
- Hypothetical amount
- 0.8
1C integration
- What is inside
- Two-way exchange of reference data and documents
- Hypothetical amount
- 1.0
Kaspi integration
- What is inside
- One link: orders and stock
- Hypothetical amount
- 0.4
Extended reports
- What is inside
- Margin per order, stock turnover, split by manager
- Hypothetical amount
- 0.7
Second phase
- What is inside
- Purchasing module and financial accounting
- Hypothetical amount
- 3.0
Total
- What is inside
- The full scope, about 4–6 months
- Hypothetical amount
- 10.9
What makes an ERP more expensive, and common mistakes
- No process owner on the company side: every decision takes weeks to approve.
- Wanting everything at once: ten modules in the first phase instead of the two or three where it hurts.
- Spreadsheet data with no common format: migration turns into manual cleaning.
- Two-way exchange with 1C without rules on which system is the master: data drifts apart.
- Changing the scope on the fly: every «let's add this too» moves the date and the price.
- No staff training: the system exists, but people keep working in spreadsheets.
More about connecting to an accounting system is in the article «Integrating 1C with a web application».
Custom or off-the-shelf: an honest comparison
Custom ERP
- Built around your processes, roles and integrations
- Usually no per-user fee: you pay for development and support
- Code and access are yours from the first commit
- Slower start: design and a first phase come first
Off-the-shelf platform
- Quick start: the system already exists
- Licences are paid continuously, usually per user
- Non-standard processes need customisation and workarounds
- Development depends on the vendor and its plans
Questions to ask a contractor before signing
- A quote by module and phase, not one total figure.
- What is in the first phase and what is deferred to later ones.
- How 1C and Kaspi integrations work: one-way or two-way exchange, which system is the master.
- Who migrates the data and how the result is verified.
- Which reports are included and who configures them.
- What load is planned for: how many users and operations the system handles.
- Timing for each phase and a demo of the working version every 2 weeks.
- Code, database and access belong to you from the first commit.
- What the warranty covers (InterLAB: 6 months for bug fixes) and what counts as a new task.
Support for an ERP after launch is priced individually: it depends on the number of users, integrations and the response speed you need. Ask for the one-off development cost and support as separate lines in the quote.