CRM & ERPNovember 24, 20266 min read

How much a custom ERP system costs in Kazakhstan

In short

The cost of a custom ERP depends on the number of modules, user roles, integrations (1C, Kaspi) and the volume of data to migrate, so it is estimated in phases. InterLAB's reference points: a first ERP phase from 5 million ₸ in 2–4 months, a turnkey ERP from 10 million ₸ in 4–8 months. These are lower bounds, not a price list: an exact estimate by module is free after a brief. Support is priced individually.

Discuss your project?

A timeline and cost estimate broken down by stage — after the brief.

Contents
  1. 01What counts as ERP, and when CRM is enough
  2. 02What makes up the cost of an ERP
  3. 03A phased approach: first phase, then modules
  4. 04A hypothetical budget by stage
  5. 05What makes an ERP more expensive, and common mistakes
  6. 06Custom or off-the-shelf: an honest comparison
  7. 07Questions to ask a contractor before signing

What counts as ERP, and when CRM is enough

ERP is a single system for a company's resources: orders, stock, purchasing, production, finance, staff. A CRM tracks customers and sales; an ERP covers everything that happens to an order after the sale. If the price worries you, first check whether you actually need an ERP.

CRM is enough

  • The main pain is lost leads and chaos in sales
  • Stock and accounting already run in 1C and work for you
  • You need to see the pipeline and what managers do
  • Orders do not pass through several departments

You need an ERP

  • An order passes through stock, purchasing, production or delivery
  • Stock and money data sit in different spreadsheets and disagree
  • The head of the business cannot quickly see the margin per order
  • Several divisions, roles and locations, with access rights to separate

The difference is covered in detail in the article «CRM or ERP: what a business should choose», and the terms (MRP, WMS and others) in the «Dictionary of systems». The cost of a custom CRM has its own article, «How much a custom CRM costs».

What makes up the cost of an ERP

The price of an ERP is set not by the size of the program but by the set of decisions to build and test. These are the lines a quote is made of.

Modules

What it depends on
Orders, stock, purchasing, production, finance, HR
How not to overpay
Start with the modules where money is lost today

Roles and permissions

What it depends on
Number of divisions, access levels, approvals
How not to overpay
Describe roles up front: changing permissions later costs more

1C integration

What it depends on
One-way export or two-way exchange, size of the reference data
How not to overpay
Decide which system is the master for each kind of data

Kaspi and marketplace integration

What it depends on
Orders, stock, prices, statuses
How not to overpay
Connect the channel that brings most of your orders

Data migration

What it depends on
Volume and cleanliness of data in spreadsheets and old systems
How not to overpay
Remove duplicates and stale records before the move

Reporting

What it depends on
Number of reports, level of detail, split by branch
How not to overpay
Pick the 5–7 reports that decisions are actually based on

Load and reliability

What it depends on
Number of users, volume of operations, availability needs
How not to overpay
Plan for growth over 2–3 years, not for launch week
What shapes the ERP budget

A phased approach: first phase, then modules

An ERP should not be built in one go: requirements become clearer as work proceeds, and staff get used to the system gradually. A workable scheme is a first phase with the core, then modules by priority.

Process description and design

What is inside
Process map, roles, list of modules, order of phases
Reference point and timing
Estimate free after a brief

First phase

What is inside
The core: orders and stock, roles, basic reports, transfer of key data
Reference point and timing
From 5 million ₸, 2–4 months

Further modules

What is inside
Purchasing, production, finance, extended reports, integrations
Reference point and timing
Turnkey ERP from 10 million ₸, 4–8 months
ERP stages and InterLAB reference points

A hypothetical budget by stage

A hypothetical example: a wholesale company with one warehouse wants to combine orders, stock and purchasing, exchange data with 1C and receive orders from Kaspi. The figures below are hypothetical and only show how a budget is distributed; they are not an offer or a fixed price.

First phase

What is inside
Design, orders, stock, roles, basic reports
Hypothetical amount
5.0

Data migration

What is inside
Item catalogue, counterparties, stock from spreadsheets and 1C
Hypothetical amount
0.8

1C integration

What is inside
Two-way exchange of reference data and documents
Hypothetical amount
1.0

Kaspi integration

What is inside
One link: orders and stock
Hypothetical amount
0.4

Extended reports

What is inside
Margin per order, stock turnover, split by manager
Hypothetical amount
0.7

Second phase

What is inside
Purchasing module and financial accounting
Hypothetical amount
3.0

Total

What is inside
The full scope, about 4–6 months
Hypothetical amount
10.9
Hypothetical ERP budget, million ₸

What makes an ERP more expensive, and common mistakes

  • No process owner on the company side: every decision takes weeks to approve.
  • Wanting everything at once: ten modules in the first phase instead of the two or three where it hurts.
  • Spreadsheet data with no common format: migration turns into manual cleaning.
  • Two-way exchange with 1C without rules on which system is the master: data drifts apart.
  • Changing the scope on the fly: every «let's add this too» moves the date and the price.
  • No staff training: the system exists, but people keep working in spreadsheets.

More about connecting to an accounting system is in the article «Integrating 1C with a web application».

Custom or off-the-shelf: an honest comparison

Custom ERP

  • Built around your processes, roles and integrations
  • Usually no per-user fee: you pay for development and support
  • Code and access are yours from the first commit
  • Slower start: design and a first phase come first

Off-the-shelf platform

  • Quick start: the system already exists
  • Licences are paid continuously, usually per user
  • Non-standard processes need customisation and workarounds
  • Development depends on the vendor and its plans

Questions to ask a contractor before signing

  • A quote by module and phase, not one total figure.
  • What is in the first phase and what is deferred to later ones.
  • How 1C and Kaspi integrations work: one-way or two-way exchange, which system is the master.
  • Who migrates the data and how the result is verified.
  • Which reports are included and who configures them.
  • What load is planned for: how many users and operations the system handles.
  • Timing for each phase and a demo of the working version every 2 weeks.
  • Code, database and access belong to you from the first commit.
  • What the warranty covers (InterLAB: 6 months for bug fixes) and what counts as a new task.

Support for an ERP after launch is priced individually: it depends on the number of users, integrations and the response speed you need. Ask for the one-off development cost and support as separate lines in the quote.

Discuss your project?

A timeline and cost estimate broken down by stage — after the brief.

Tell us about your task — we'll review your request and get back to you

Got a project?
We'll scope and estimate it — for free.

Tell us about the product or the problem. After reviewing the task we'll come back with an architecture, a timeline and a price for the first version.

  • Scope and risks estimated before we start
  • NDA — yours or ours
  • Work starts within a week

Please do not send passwords, access keys or source code through this form — we will agree a safe way to share access separately.

By clicking the button you agree to the processing of your personal data.

Message us on WhatsApp