Proposal builder

Proposal templates for IT projects: scope, phases, estimate, timeline, assumptions and exclusions. Totals and the payment schedule are computed from line items — they cannot be “adjusted” by hand; revisions are compared by money and timeline, and an accepted one is frozen as read-only.

Free, no sign-up

Loading the builder…

How the builder works

  1. A template or an estimate

    Pick a template (MVP, website, mobile app, integration, audit or blank) or load an approved estimate from the scope calculator — a scope-snapshot file. Templates never invent prices: the rates are yours.

  2. Scope, phases, estimate, terms

    Line items: work, quantity, unit, price. Phases run one after another: durations build a week-by-week timeline (calendar dates with a start date), payment shares become payment amounts.

  3. Pre-send checks

    Published rules with IDs: empty required sections, validity date, assumptions and exclusions, a payment schedule of exactly 100%, zero or negative lines, price and timeline outside the estimate range, phases without deliverables.

  4. Status and revisions

    Draft → sent → accepted or rejected. A revision is saved automatically when you send or accept; the accepted one is pinned and the document becomes read-only. Edits go into a new revision only.

Templates

  • MVP development — A first-version web product: design, build, launch.
  • Website / landing page — Structure, design, build, CMS, SEO basics.
  • Mobile app — iOS and Android, store publishing.
  • Integration and automation — Connecting systems, data exchange, monitoring.
  • Audit / consultation — A review of code, architecture or process with a report.
  • Blank — Structure only — you fill in everything.

Switching templates in a non-empty document asks for confirmation: the template replaces the scope, phases, estimate and terms, while the client, contractor, number, dates and currency stay.

Rules and calculation

The table is generated from the same code as the checks — rules v1.0 (13.10.2026). Blocking issues prevent marking the proposal as sent or accepted; warnings and hints are your call.

PB-R01

Rule
Client and project name are filled in
Level
blocks sending
Why
Without them the document cannot be tied to an agreement.

PB-R02

Rule
The contractor is named
Level
blocks sending
Why
The client must see who the proposal is from.

PB-R03

Rule
The problem and goal are described
Level
warning
Why
The goal explains why the scope exists and prevents “that's not what we asked for”.

PB-R04

Rule
There is a scope of work
Level
blocks sending
Why
A price without a scope is a number, not a proposal.

PB-R05

Rule
There are phases
Level
blocks sending
Why
Phases set the timeline, deliverables and payment schedule.

PB-R06

Rule
The estimate has line items
Level
blocks sending
Why
The total is computed from line items only — it cannot be typed in.

PB-R07

Rule
No empty, zero or negative line items
Level
blocks sending
Why
A line without a description, or with a zero quantity or price, signals an unfinished estimate.

PB-R08

Rule
The total is above zero
Level
blocks sending
Why
A zero total after discount is an input error.

PB-R09

Rule
The payment schedule adds up to exactly 100%
Level
blocks sending
Why
Otherwise the payments will not match the contract total.

PB-R10

Rule
Every phase has deliverables
Level
warning
Why
A deliverable is what gets accepted and paid for.

PB-R11

Rule
Every phase has a duration
Level
warning
Why
A phase without a duration drops out of the timeline.

PB-R12

Rule
A validity date is set
Level
warning
Why
Rates and capacity change; an open-ended proposal can be “accepted” six months later.

PB-R13

Rule
The validity date has not passed
Level
blocks sending
Why
An expired proposal should be refreshed, not sent.

PB-R14

Rule
Assumptions are listed
Level
warning
Why
Assumptions are the conditions under which price and timeline hold.

PB-R15

Rule
Exclusions are listed
Level
warning
Why
An explicit “not included” removes most scope disputes.

PB-R16

Rule
Payment terms are described
Level
warning
Why
Percentages alone do not say when and how to pay.

PB-R17

Rule
The currency code is three Latin letters
Level
blocks sending
Why
KZT, USD, EUR, RUB: one unambiguous currency for every amount.

PB-R18

Rule
The currency matches the estimate's
Level
warning
Why
Amounts in different currencies cannot be compared without an exchange rate.

PB-R19

Rule
The price is within the estimate range
Level
warning
Why
Departing from the approved estimate should be deliberate and explained.

PB-R20

Rule
The phase timeline is within the estimate range
Level
warning
Why
Total phase weeks are checked against the estimate's timeline.

PB-R21

Rule
Warranty and support are described
Level
hint
Why
The client will ask what happens after launch.
Pre-send check rules, v1.0, 13.10.2026
  • Line amount = quantity × price, rounded to cents. The discount applies to the line total, tax to the amount after discount.
  • A phase payment = total × the phase share. When shares add up to exactly 100%, the last payment absorbs the rounding remainder — payments match the total to the cent.
  • Estimate check: the price before tax against the scope-snapshot cost range, total phase weeks against its timeline range. Different currencies are not compared without an exchange rate — you get a separate warning.

Limitations

  • The builder does not estimate effort or suggest rates — you or the scope calculator do. Checks catch inconsistencies in the document, not errors in the estimate.
  • The “accepted” mark is entered by you based on the client's word. It is not an electronic signature or legal proof of a contract.
  • The document and revisions live only in this browser. There is no multi-user editing or link sharing — share the PDF, Markdown or JSON file.
  • Tax rates and invoicing rules in your country are not checked.

Privacy

  • Everything is computed in your browser: the tool itself sends nothing to a server; client data, prices and contacts never appear in the page address.
  • The draft and revisions are stored only in this browser's localStorage; “Clear all” deletes them. Exports are files you download yourself.
  • Analytics receives only the fact of an export or a status change with categories: template, status, file format — no amounts or text.
  • The result reaches us only if you send a request yourself and keep the “Attach the result” box ticked — the form shows exactly what will be sent. The summary holds the template, total, phases with payments, timeline, status and checks; client and contractor contacts are never included.

Related tools

All tools · 40
Tell us about your task — we'll review your request and get back to you

Need help estimating the project?

A technical consultation is a paid review of scope, risks and timeline before you send a proposal. The first short conversation about the format is free; the cost is set after a brief.

  • The first short conversation is free — we choose the format
  • NDA — yours or ours
  • Pricing after a brief and an agreed scope