InterLAB tools · 37 checks · evidence · GO/NO-GO

Release readiness

A check matrix tailored to your release type: CI and tests, migrations, backups, a rollback plan, monitoring, security, data. Each check gets evidence, each accepted risk gets a recorded exception, and the release gets role sign-off. You get a GO / NO-GO decision with reasons and a report for the team.

Free, no sign-up

Rules v1.0, 2026-10-13

Verdict

Insufficient data

preliminary

Blocking checks are not checked or not backed by evidence.

The verdict becomes final once every required role records a decision (RR-S3).

  • verified: 0
  • unverified: 0
  • failed: 0
  • exception: 0
  • not applicable: 0
  • not checked: 27

About the release

HH:MM

Release type
Release specifics

Flags make some checks required or blocking (see the table on the page).

Matrix: 2 blocking, 15 required, 10 recommended; 10 not applicable to this release.

How the readiness check works

  1. The release and its specifics

    Release type (hotfix, minor, major, first launch) and flags: migrations, personal and payment data, infrastructure, feature flags, app stores. They set each check's level: blocking, required, recommended or not applicable.

  2. Checks with evidence

    Each check has a status, evidence (a link, CI output, a screenshot reference, text), who checked it and a note. “Passed” without evidence counts as “unverified”. Pasted CI output is parsed: GitHub Actions and GitLab jobs, and Jest, Vitest, pytest, JUnit, Mocha, Playwright and Go summaries.

  3. Exceptions and plans

    A failed check can be accepted as a risk — only with a reason, mitigation, approver and expiry date. The “Rollback plan” and “Monitoring” sections serve as evidence for the related checks.

  4. Verdict and sign-off

    The verdict follows published rules: NO-GO, “Insufficient data”, GO with exceptions or GO — with a list of reasons linked to checks. It becomes final once every required role decides; each decision saves a pinned version with a snapshot of the evidence.

Verdict rules

The tables below are generated from the same code as the calculation. Rules apply in order: NO-GO first, then “Insufficient data”, then GO with exceptions, otherwise GO.

RR-E1

Rule
“Passed” without evidence (text, a link, a CI log or a completed tool section) is “unverified”.

RR-E2

Rule
“Passed”, but the pasted CI log shows failures (failed jobs, tests or step errors) — “unverified”; the evidence lines are shown.

RR-E3

Rule
“Not applicable” on a blocking or required check without a reason — “unverified”.

RR-E4

Rule
Hint: “link” evidence should contain an http(s) address. Does not affect the verdict.

RR-X1

Rule
An exception is valid only with a reason, mitigation, approver and expiry date, and only until it expires (expiry ≥ today). An invalid exception counts as “failed”.

RR-F1

Rule
Completed “Rollback plan” and “Monitoring” sections serve as evidence for RR-14, RR-16, RR-17, RR-18 and RR-19. A person still sets the status.

RR-V1

Rule
NO-GO: a blocking check failed without a valid exception.

RR-V2

Rule
NO-GO: a required role rejected the release (the role's latest decision).

RR-V3

Rule
“Insufficient data”: the release name or type is missing, or blocking checks are not checked or unverified.

RR-V4

Rule
GO with exceptions: blocking checks passed or have exceptions, but there are exceptions or unverified required checks.

RR-V5

Rule
GO: every blocking and required check passed with evidence (or is justifiably not applicable), with no exceptions.

RR-S1

Rule
Required sign-off roles depend on the release type and flags (table below).

RR-S2

Rule
A sign-off becomes stale if the release data (checks, evidence, exceptions, rollback plan, monitoring) changed after it.

RR-S3

Rule
The verdict is final only when every required role has a current decision; otherwise it is preliminary.
Evidence, exception, verdict and sign-off rules

Hotfix

Who signs off
Tech lead

Minor release

Who signs off
Tech lead, QA

Major release

Who signs off
Tech lead, QA, Product owner

First launch

Who signs off
Tech lead, QA, Product owner

+ Changes personal or payment data handling

Who signs off
Data protection owner

+ Changes infrastructure (servers, network, configuration)

Who signs off
DevOps / SRE
Required sign-off roles (RR-S1)

Check matrix

A check's level comes from the release type; flags can only raise it. Teams add their own checks with a chosen level and save them as a template for the next releases.

RR-01

Check
Build and CI are green on the release commit (Code and CI)
Hotfix
blocking
Minor release
blocking
Major release
blocking
First launch
blocking
Flags raise to
—

RR-02

Check
Release content is fixed: a tag or branch and a change list (Code and CI)
Hotfix
required
Minor release
required
Major release
required
First launch
required
Flags raise to
—

RR-03

Check
All changes passed code review (Code and CI)
Hotfix
required
Minor release
required
Major release
blocking
First launch
blocking
Flags raise to
—

RR-04

Check
Static analysis and linter show no new errors (Code and CI)
Hotfix
recommended
Minor release
required
Major release
required
First launch
required
Flags raise to
—

RR-05

Check
Automated tests (unit and integration) passed (Tests)
Hotfix
blocking
Minor release
blocking
Major release
blocking
First launch
blocking
Flags raise to
—

RR-06

Check
Smoke and E2E tests of critical flows passed on staging (Tests)
Hotfix
required
Minor release
required
Major release
blocking
First launch
blocking
Flags raise to
—

RR-07

Check
QA checked regression in affected areas (Tests)
Hotfix
recommended
Minor release
required
Major release
required
First launch
required
Flags raise to
—

RR-08

Check
The fix was verified against the original failure scenario (Tests)
Hotfix
blocking
Minor release
recommended
Major release
recommended
First launch
not applicable
Flags raise to
—

RR-09

Check
The migration was run on a copy of production data (Database and migrations)
Hotfix
not applicable
Minor release
not applicable
Major release
not applicable
First launch
not applicable
Flags raise to
Has database migrations → blocking

RR-10

Check
The migration is compatible with the current code (expand/contract) or downtime is agreed (Database and migrations)
Hotfix
not applicable
Minor release
not applicable
Major release
not applicable
First launch
not applicable
Flags raise to
Has database migrations → required

RR-11

Check
Locks and duration of migrating large tables were assessed (Database and migrations)
Hotfix
not applicable
Minor release
not applicable
Major release
not applicable
First launch
not applicable
Flags raise to
Has database migrations → required

RR-12

Check
A fresh backup was taken before the release (Backups)
Hotfix
recommended
Minor release
recommended
Major release
required
First launch
required
Flags raise to
Has database migrations → blocking; Changes personal or payment data handling → required

RR-13

Check
Restoring from the backup was tested (Backups)
Hotfix
not applicable
Minor release
recommended
Major release
recommended
First launch
required
Flags raise to
Has database migrations → blocking

RR-14

Check
A rollback plan exists: triggers, steps, owner, time (Rollback plan)
Hotfix
required
Minor release
required
Major release
blocking
First launch
blocking
Flags raise to
Has database migrations → blocking

RR-15

Check
Rollback was rehearsed or the previous version is ready to deploy (Rollback plan)
Hotfix
required
Minor release
required
Major release
required
First launch
required
Flags raise to
—

RR-16

Check
There is a data rollback plan (down migration or restore) (Rollback plan)
Hotfix
not applicable
Minor release
not applicable
Major release
not applicable
First launch
not applicable
Flags raise to
Has database migrations → required

RR-17

Check
Key metric dashboards are ready (errors, latency, a business metric) (Monitoring and alerts)
Hotfix
required
Minor release
required
Major release
blocking
First launch
blocking
Flags raise to
—

RR-18

Check
Error and availability alerts are set up and tested (Monitoring and alerts)
Hotfix
required
Minor release
required
Major release
required
First launch
blocking
Flags raise to
—

RR-19

Check
Someone is assigned to watch the release, and for how long (Monitoring and alerts)
Hotfix
required
Minor release
required
Major release
blocking
First launch
blocking
Flags raise to
—

RR-20

Check
Error tracking and logs are wired up for the new version (Monitoring and alerts)
Hotfix
recommended
Minor release
required
Major release
required
First launch
required
Flags raise to
—

RR-21

Check
No secrets in code or artifacts; environment variables are configured (Security)
Hotfix
required
Minor release
required
Major release
blocking
First launch
blocking
Flags raise to
—

RR-22

Check
Dependencies were scanned for known vulnerabilities (no critical ones) (Security)
Hotfix
recommended
Minor release
required
Major release
required
First launch
blocking
Flags raise to
—

RR-23

Check
Access control for new endpoints and roles was checked (Security)
Hotfix
recommended
Minor release
recommended
Major release
required
First launch
required
Flags raise to
Changes personal or payment data handling → blocking

RR-24

Check
Network rules and infrastructure access follow least privilege (Security)
Hotfix
not applicable
Minor release
not applicable
Major release
not applicable
First launch
not applicable
Flags raise to
Changes infrastructure (servers, network, configuration) → required

RR-25

Check
Performance of changed critical paths was checked (Performance)
Hotfix
recommended
Minor release
recommended
Major release
required
First launch
required
Flags raise to
—

RR-26

Check
Resource limits and scaling were checked (Performance)
Hotfix
recommended
Minor release
recommended
Major release
recommended
First launch
required
Flags raise to
Changes infrastructure (servers, network, configuration) → required

RR-27

Check
Release notes or a changelog are ready (Docs and communication)
Hotfix
recommended
Minor release
required
Major release
required
First launch
required
Flags raise to
—

RR-28

Check
Support and stakeholders were notified (Docs and communication)
Hotfix
recommended
Minor release
recommended
Major release
required
First launch
required
Flags raise to
—

RR-29

Check
The release window is agreed and owners are reachable (Docs and communication)
Hotfix
recommended
Minor release
required
Major release
required
First launch
required
Flags raise to
—

RR-30

Check
Operational runbooks are updated (Docs and communication)
Hotfix
not applicable
Minor release
recommended
Major release
recommended
First launch
required
Flags raise to
Changes infrastructure (servers, network, configuration) → required

RR-31

Check
New feature flags default to off, with a kill switch (Flags and staged rollout)
Hotfix
not applicable
Minor release
not applicable
Major release
not applicable
First launch
not applicable
Flags raise to
Feature flags are used → required

RR-32

Check
A staged rollout plan with expansion criteria (Flags and staged rollout)
Hotfix
not applicable
Minor release
recommended
Major release
required
First launch
required
Flags raise to
Feature flags are used → required; Mobile app store release → required

RR-33

Check
The build passed store review; phased release is configured (Flags and staged rollout)
Hotfix
not applicable
Minor release
not applicable
Major release
not applicable
First launch
not applicable
Flags raise to
Mobile app store release → blocking

RR-34

Check
The API stays compatible with older clients (Flags and staged rollout)
Hotfix
recommended
Minor release
recommended
Major release
required
First launch
required
Flags raise to
Mobile app store release → required

RR-35

Check
Personal data handling follows the policy (consent, retention, access) (Data and compliance)
Hotfix
not applicable
Minor release
not applicable
Major release
not applicable
First launch
not applicable
Flags raise to
Changes personal or payment data handling → blocking

RR-36

Check
Payment flows (charge, refund) were tested in the provider's sandbox (Data and compliance)
Hotfix
not applicable
Minor release
not applicable
Major release
not applicable
First launch
not applicable
Flags raise to
Changes personal or payment data handling → required

RR-37

Check
Access to sensitive data is logged (Data and compliance)
Hotfix
not applicable
Minor release
not applicable
Major release
not applicable
First launch
not applicable
Flags raise to
Changes personal or payment data handling → required
Check matrix v1.0, 2026-10-13: level by release type

Limitations

  • The tool checks the completeness and consistency of evidence, not the systems themselves: a link to a green CI run is not opened or verified.
  • CI output parsing recognises common formats; if a format is not recognised, the output stays as text evidence.
  • Sign-off records names and decisions as entered — it is not an electronic signature and does not replace your company's approval procedure.
  • The matrix is a sensible minimum for web and mobile products, not an industry standard: regulated industries add their requirements as custom checks.
  • Data lives in one browser; collaboration works through JSON export and import.

Privacy

  • The release, evidence, names and decisions are stored only in this browser's localStorage and are not sent to a server on their own. “Clear everything” deletes them together with versions.
  • The result reaches us only if you send a request yourself and keep the “Attach the result” box ticked — the form shows exactly what will be sent. The summary holds the release name and version, type, verdict, blockers, exceptions and sign-off by role; links, evidence, notes and names are never included.
  • Before export, the tool warns if the evidence looks like it contains keys or passwords from pasted CI output.
  • Analytics receives only the verdict (a category) and the export format — no names, people or evidence.

Related tools

All tools · 40
Tell us about your task — we'll review your request and get back to you

Want an independent look before you ship?

A code and release process audit: we review CI, migrations, rollback and monitoring on your project and give you a prioritised risk list. The first short conversation about the format is free.

  • The first short conversation is free — we choose the format
  • NDA — yours or ours
  • Pricing after a brief and an agreed scope